Skip to content

The New and Improved Timeline

Wildflowers in Crested Butte
Mobile Updates

Search Tickets

The New and Improved Timeline

Timeline Re-Opening

Timeline is now better than ever with improved berms and stellar jump features! We have done a month long facelift on this expert trail that was originally built in 2007. Please note, this remodeled trail has sections that have been completely redesigned. We ask that you fully inspect all features before trying to "send it"! 

Timeline can been described as a fast and flowing trail through awesome natural terrain with a variety of dirt and wood features to keep you smiling. We are stoked to announce that this popular expert gravity fed trail has gone through a complete overhaul.  The track is still true to its original alignment with improvements made to drainage, berms, jumps and overall sustainability.  

The willow zone of Timeline is now complete with new wetland crossings. The upper crossing is a “floating trail.”  This technique includes rock subgrade with integrated drainage pipes, then capped with dirt. Fabric separates the dirt and rock to provide longevity for years to come. This design allows the water and willow zone to thrive without becoming constricted by the trail. In addition, the lower water crossing is bridged with a log bridge that crosses the water. 

Timeline has been a favorite trail to many of our bike park users for a long time, and we hope this rebuild reinforces the Evolution Bike Park's commitment to creating some of the best lift accessed trails in the country.